PHOTOGRAPHER’S JOURNAL: From his matchstick tower the crane operator saw all and controlled levers and pedals that connected by rods and cables to the motors and gears beneath him that made the crane do all its tricks. Before the windows were boarded, this was the eye of operations. The crane operators I’ve known were all deliberate people aware of the momentum of the mass they moved. How long did it take to master the technique for controlling the machine? How many master crane operators have sat here since the crane was built in 1917? Or did they stand? Was there once a chair, or did one have to lean into the machinery with the whole of one’s body?
Sunday, May 24, 2015
Subscribe to:
Posts (Atom)